Rio Tinto adds $2.9 million tellurium recovery circuit at Utah’s Kennecott to produce about 20 tons a year
Rio Tinto's $2.9M tellurium recovery circuit at its Kennecott copper refinery adds ~20 tons/year of byproduct tellurium, feeding North American thin-film solar supply chains amid China's dominance in refined tellurium and export licensing. The initiative marginally improves operational decarbonization via a 30MW solar buildout, but the output is too small to shift global tellurium markets; it mainly reduces supply-chain risk for downstream users.
Affected assets
NCCO724COPPER2USD/USDT+0.23%
AI Insight · NCCO724COPPER2USD/USDTAI Insight
● Neutral
⚠️ AI-generated insights are based on news content and are provided for informational purposes only. They do not constitute investment advice or represent the views of BingX. Investing involves risk. Please trade responsibly.
Rio Tinto has invested $2.9 million to add a tellurium recovery circuit at its Kennecott copper refinery in Utah, aiming to produce about 20 tons of tellurium a year from byproducts. The tellurium has been used in more than 71,000 thin-film solar modules at a nearby 25-megawatt solar plant that has been supplying power since December 2025. About 90% of the world’s tellurium is contained in copper ore, and the project is intended to provide a domestic tellurium supply for the U.S. solar industry.